Appendix B- Fixup Timetable

november, 2004
1
2
POD2 returned to warehouse.
3
4
5
6

7
Guest Bath painted.
8
9

10
Guest BR painted
11
12
New boiler / superstor ordered.
13
Guest Bath vanity installed.
14
Girls bedroom painted
15
16

17
18
19
SuperStor / Munchkin arrive
20
Installing SuperStor / Munchkin
21
Munchkin and SuperStor working by COB
22
23

24
Pool filter arrives
25
26
27
28
Install gallery bookcases.
29
Pool pump arrives
30
Building skylite frames
Pressure washer arrives

december, 2004
1
Opening guest room roof to replace termite damaged boards.
2
Replacing skylights.
Pool heater arrives.
3
New roof installed!
4
QA done on roof- it rained- no leaks!
5
6
7
8
Removing old aux water heater.
Capping cold water lines.
9
.
10

11
12
Pressure washed driveway!
13
14
15
Redid cold water supply to pool.
16
17
18
19

20
21
22
23
24
25
26

27
28
29
30
31

january, 2005






1
2

3
4
5
6
7
8
9

10
11
12
13
14
15
16
17
18
19
20
21
22
23

24
25
26
27
28
29
30

31





february, 2005


1
2
3
4
5
6
7
8
9
10
11
12
13
Tile Master Bath
14
15
Pool sandblasted.
16
17
18
19
20
Paint Master Bedroom
21
Gallery paint done.
22
Master Sink area tiled.
23
24
25
26
27

28





march, 2005


1
2
3
4
5
6

7
8
9
10
11
12
13
Repaint Gallery
14
15
16
17
18
19
Tile Guest Bath, Laundry room
20
Paint Laundry room
21
22
23
24
Grout Guest Bath floor
25
Grout Master Bath floor
26
Install Guest Bath molding
27

28
29
30
31


april, 2005





1
2
Repaint Guest Bedroom
Strip Powder room floor
Prime Powder room
3
Work on Guest BR electrics
Paint Powder room.
4
5
6
7
8
9
10

11
12
13
14
15
16
17

18
19
20
21
22
23
24

25
26
27
28
29
30

may, 2005
1

2
3
4
5
6
7
8

9
10
11
12
13
14
15

16
17
18
19
20
21
22

23
24
25
26
27
28
29

30
31
Painting pool walls w/pop.
Prepping for pool tile- cutting lip to accomdate bigger tile.




june, 2005



1
2
Tiling pool.
3
4
Tiling pool.
5
Tiling pool.
6
7
8
9
10
11
12
Grouting pool tile w/JasonT
13
14
15
16
17
18
19

20
21
22
23
24
25
26

27
28
29
Primed spa, steps with Gunzite
30
Painted spa, steps with Zeron


july, 2005





1
2
Removing tile from girls' BR, Playroom, hallway and bath
3
Stripping goo from girls' BR, Playroom, hallway and bath
4
Repainting girls' BR and Playroom
5
Painted girls' doors and trim
6
7
8
9
10

11
12
13
14
15
16
17

18
19
20
21
22
23
Primed pool
24
Painted pool
25
Touched up pinholes in pool
26
27
28
29
30
Filled remaining pinholes with poxofill
31
Cobbled together Solar Panels on roof
Start filling pool with hose.


Filling pool.

Filling pool- done!



august, 2005

1
Filling pool.
2
Filling pool.
3
Filling pool.
4
Cleaning pump- circulating again
5
6
7

8
Installing AquaLogic controller
9
10
11
12
13
14

15
16
Enabling chlorinator.
Adding valve actuators, temp sensors
17
18
Re-routed kitchen wires.
19
Added outdoor light behind kitchen.
20
21

22
23
24
25
26
27
Redid solar valving so all water goes thru solar into pool.
28

29
Added valve actuator for solar- now solar works whenver we have enough sun!
30
31



september, 2005




1
2
Hooked up pool/spa heater!
3
Pressure washed front atrium
Whacked all bushed in front of house.
4

Painted front of house.
5
Painted front of house.
6
7
8
9
10
11

12
13
14
15
16
17
18
19
20
21
22
23
24
25

26
27
28
29
30

october, 2005






1
2

3
4
5
6
7
8
Rebuilding garage eaves
9

10
11
12
13
14
15
16

17
Rebuilding rear skylights
18
Rebuilding rear skylights
19
20
Rebuilding rear skylights
21
Rebuilding rear skylights
22
23

24
25
building siding jig.
26
finished siding jig.
27
28
29
30

31





november, 2005

1

2

3

4
Replacing siding around MBR AC unit
5

6
7
8

9

10

11

12

13
14
15

16

17
Replacing oven.
18

19

20
21
22

23

24
25

26

27
28
29

30







december, 2005





1

2

3

4
5
6

7

8

9

10

11
Rebuilding fence by guest BR.
12
13

14

15

16

17

18
19
20
Clearing land for playhouse.
21
22
23
24
Roof is on playhouse.
25
26
27
28
29
Playhouse windows are in.
30
Playhouse rubber roof is on.

31

january, 2006
1
2
3

4
5
6
7
8
9
10
Playhouse electrified.
11
12
13
14
15
Ripping out girls bath to the studs.
16
Replaced girls bath window.
17

18
19
20
21
Playhouse insulated.
22
Jeff helps replace girls BR window.
23
24
25
26
27
28
29
30
31




february, 2006



1
Built box to cover radiant heat manifold in office.
2

3

4

5
6
Installed pool cover.
7

8
Playhouse paneling done.
9

10

11


12
13

14

15

16

17

18

19
20
21

22

23

24

25

26
27
28









march, 2006



1

2

3

4

5
6
7

8

9

10

11

12
13
14

15

16

17

18

19
20
21

22

23

24

25

26
27
28

29

30

31



april, 2006









1

2
3
4

5

6

7

8

9
10
11

12

13

14

15

16
17
18

19

20

21

22

23
24
25

26

27

28

29

30











may, 2006
1
2

3

4

5

6

7
8
9

10

11

12

13

14
15
16

17

18

19

20

21
22
23

24

25

26

27

28
29
30

31







june, 2006





1
2

3

4
5
6

7

8

9

10

11
12
13

14

15

16

17

18
19
20
21
22
23
24
25
26
27
28
29
30


july, 2006








1
2
3
4
5
6
7
8
9
10
11

12

13

14

15

16
17
18

19

20

21

22

23
24

25

26

27

28

29

30
31










august, 2006

1

2

3

4

5

6
7
8

9

10

11

12

13

14
15

16

17

18

19

20
21
22

23

24

25

26

27
28
29

30

31





september, 2006







1

2

3
4
5

6

7

8

9

10
11
12

13

14

15

16

17
18
19

20

21

22

23

24
25
26

27

28

29

30

october, 2006
1
2
3

4

5

6

7

8
9
10
11
12

13

14

15
16
17

18

19

20

21

22
23
24

25

26

27

28

29
30
31









november, 2006



1

2

3

4

5
6
7

8

9

10

11

12
13
14

15

16

17

18

19
20
21

22

23
24

25

26
27
28

29

30





december, 2006







1

2

3
4
5

6

7

8

9

10
11
12

13

14

15

16

17
18
19
20
21
22
23
24
25
26
27
28
29

30

31