| 1. finish master bath | ||
|
|
![]() |
![]() |
| 2. backsplashes (over both bathroom vanities) | |
|
Tiles have been installed. Mirrors have been installed. |
![]() |
| 3. finish atrium | ||
|
|
![]() |
![]() |
| 4. replace washer/dryer hallway cabinets | |
|
identically sized cabinets have been ordered. they should be here around 25-jan-01. |
![]() |
| 5. fix up floor outlet in living room | |
|
hole has been cut for fixture. need to- |
![]() |
| 6. redo pantry | |
|
we never redid the pantry. we have to- |
![]() |
| 7. replace exterior 4x6 post by front walk | |
|
|
![]() |
| 8. make exterior light work again | |
| this is a george bug- he needs to play w/wiring and 3-way switch to make this work again. | |
| 9. cable light in other hallway | |
| done! | ![]() |
| 10. finish off exterior garden wall | |
|
|
![]() |