1. finish master bath | ||
|
2. backsplashes (over both bathroom vanities) | |
Tiles have been installed. Mirrors have been installed. |
3. finish atrium | ||
|
4. replace washer/dryer hallway cabinets | |
identically sized cabinets have been ordered. they should be here around 25-jan-01. |
5. fix up floor outlet in living room | |
hole has been cut for fixture. need to- |
6. redo pantry | |
we never redid the pantry. we have to- |
7. replace exterior 4x6 post by front walk | |
|
8. make exterior light work again | |
this is a george bug- he needs to play w/wiring and 3-way switch to make this work again. |
9. cable light in other hallway | |
done! |
10. finish off exterior garden wall | |
|