App E- Left To Do

1. finish master bath
  • 1. rip out old shower
  • 2. replace fixtures (got parts)
  • 3. put down poly hot mop (need parts)
  • 4. install cement board (got parts)
  • 5. tile the shower
  • 6. sheetrock bathroom (got parts)
  • 7. plaster bathroom
  • 8. paint bathroom (got parts)
  • 9. finish flooring (need parts)
  • 2. backsplashes (over both bathroom vanities)
    Tiles have been installed.
    Mirrors have been installed.
  • need to grout tile
  • need to glue down corian cap
  • 3. finish atrium
  • tile is being delivered sat, 20-jan-01
  • we are using the versailles pattern
  • need to install tile
  • grout tile
  • plant plants!
  • 4. replace washer/dryer hallway cabinets
    identically sized cabinets have been ordered.
    they should be here around 25-jan-01.
    5. fix up floor outlet in living room
    hole has been cut for fixture.
    need to-
  • install tile
  • grout tile
  • 6. redo pantry
    we never redid the pantry.
    we have to-
  • 1. paint all trim
  • 2. remove old tile
  • 3. install kitchen tile
  • 4. decide what to replace shelves with and get it done.
  • 7. replace exterior 4x6 post by front walk
  • existing post has too many holes.
  • may be able to use exiting concrete pad or may have to pour a new one.
  • project hasn't been started.
  • 8. make exterior light work again
    this is a george bug- he needs to play w/wiring and 3-way switch to make this work again.
    9. cable light in other hallway
    done!
    10. finish off exterior garden wall
  • this is the wall outside the kitchen.
  • it's about 60 feet long.
  • veneer stone should be a quick item to get (< 1 week)
  • project has not been started