Kitchen

early view of the kitchen. cabinets everywhere, walls open... making progress.
[this on 6-jan, 15 days after taking possession...!]
[14-jan-2012] making progress- all we're missing now is an oven, a sink, a fridge... little stuff!
mr. gradall back for a return visit.
...installing the...
...subZ...! woohoo!
mr. gradall also moved all this corian upstairs for us- fexcellent!
[14-jan-2012] ready to fab corian...
corian residue... several inches over most of the floor...
its hard to describe how dustry it was- check out this pix.
more corian "in progress" shots.
seaming the main counter.
here's progress! empty boxes from loading up the kitchen!
really taking shape now- it looks like a kitchen!
When we had the maple floors finished, we had to get the TV out of the family room... so we stuffed it into the kitchen.
i bet i was the only kid on the block with a 70" TV in his kitchen :-)
ready for flexco flooring...!
the tile backsplash- installed!
...and its happening. (yes, this is the same stuff we did @ shubert!)
Back ] Next ]