early view of the kitchen.
cabinets everywhere, walls open... making progress. [this on 6-jan, 15 days after taking possession...!] |
| [14-jan-2012] making progress- all we're missing now is an oven, a sink, a fridge... little stuff! | |
|
mr. gradall back for a return visit. |
| ...installing the... | |
|
...subZ...! woohoo! |
| mr. gradall also moved all this corian upstairs for us- fexcellent! | |
|
[14-jan-2012] ready to fab corian... |
| corian residue... several inches over most of the floor... | |
|
its hard to describe how dustry it was- check out this pix. |
| more corian "in progress" shots. | |
|
seaming the main counter. |
| here's progress! empty boxes from loading up the kitchen! | |
|
really taking shape now- it looks like a kitchen! |
|
When we had the maple floors finished, we had to get the TV out of the family room... so we stuffed it into the kitchen. i bet i was the only kid on the block with a 70" TV in his kitchen :-) |
|
|
ready for flexco flooring...! |
| the tile backsplash- installed! | |
|
...and its happening. (yes, this is the same stuff we did @ shubert!) |