Progress



11-aug-12
Trex going on the deck!
The deck- framed...


4-aug-12
Master bedroom carpetted


8-jul-12
guest bath just needs a vanity


1-jul-12
master shower done!


16-apr-12
Got bored last night so slammed together the vanity top for the laundry room; finished polish and install this AM :-)


15-apr-12
Master shower pan floated to right level (and all cement board installed!)


14-apr-12
Worked with John to install solar panel racks- all racks installed!


12-apr-12
New upper cabinet in laundry.
working on master shower. finished plywood...
...and roughing schleuter drain pan.


10-apr-12
reconfiguring the master vanity...
...putting it on a diet so we can redo the floor :-)


9-apr-12
Gas line installed to BBQ and lighting it up! (horrible pix but it works!)
John ran the conduit from the roof into the garage by the fronius.


8-apr-12
the bridge is done!


5-apr-12
finished flexco kitchen floor by back door.


6-apr-12
John Toshikian, my solar guy, mounted the fronius inverter in the garage.


4-apr-12
hired a stair guy and he's half done! Maple treads and risers are awesome!


2-apr-12
more with "the bridge"- finished the deck- railings and BBQ next!


1-apr-12
installed HVAC vent covers in family room
installed light in master closet
primed remainder of girls bathroom and bought and installed the heater vent for their bathroom (and laundry room)
tricking out kitchen closet w/rubbermaid shelves
working on "the bridge"- good progress today- all posts are in and the decking inside the 5 posts is done (looks like sh*t now, but its all redwood and mr. pressure washer will make it look great!)


31-mar-12
working on "the bridge"- got 5 posts in before the monsoon hit.
More flexco kitchen flooring- 95% done!
a friend came by and touched up the paint in lower hall, family room- thanks Diane!


30-mar-12
6 hours of sanding/polishing and the kitchen corian countertops done!


29-mar-12
sanding kitchen corian countertops...


28-mar-12
installed ikea cabinets in laundry.
Jorge from Tom's appliance came by and blessed the subz.


27-mar-12
finished grouting girls bathroom floor + laundry floor.
assembled ikea cabs for laundry.


26-mar-12
Finished last kitchen window sill.
prepped girls bath floor and laundry floor for grout.
sent solar doc to John Toshikian