|
day 26 -
friday, 29-aug-2003 0800am
Current state of the world- now we have |
![]() |
|
day 16 -
tuesday, 19-aug-2003 1700pm After 5+ hours of sanding then some frantic cleaning, here's what it looked like when MJ and the kids finally came home...! |
![]() |
|
day 16 -
tuesday, 19-aug-2003 0700am Corian fabrication is complete- now we just have to sand and clean! |
![]() |
|
day 13 -
saturday, 16-aug-2003 0500am Current view of the world- corian work is starting... |
![]() |
|
day 12 -
friday, 15-aug-2003 1700pm Another day- at this point, cabinets have been leveled and topped w/plywood. |
![]() |
|
day 11 -
thursday, 14-aug-2003 2200pm After a long day, 3/4 of the boxes are installed...! |
![]() |
|
day 11 -
thursday, 14-aug-2003 0900am all the cabinets on the floor... what a mess! |
![]() |
|
day 11 -
thursday, 14-aug-2003 0700am All the walls are now plastic-army-man green... |
![]() |
![]() |
...and all of our cabinets are on the truck, ready to be unloaded... can we build it? YES WE CAN! |
|
days 9 and 10
tuesday and wednesday, 12-aug-2003 george flew up to toronto to bring our cabinets home. They were custom built by our friend dave van der schaaf (who also did some work for us in CA!). He's actually a master cabinet maker and owns his own company, Dadon Carpentry . Dave and his crew did a spectacular job on our boxes- thank you very much! |
![]() |
|
day 8 -
monday, 11-aug-2003 1530pm we're getting there- the plasterer just left and now we're 3 coats of paint away from dropping in the boxes... Note the blue tape on the floor- that's where the island cabinets are going. |
![]() |
| All the existing recessed lights over the island had to move; this morning they all got replaced | ![]() |
|
day 7 -
sunday, 10-aug-2003 1200pm walls are all insulated and poly-wrapped; boarding them this afternoon... |
![]() |
|
day 6 -
saturday, 9-aug-2003 1830pm- today george finished installing the raw oak floor- tomorrow we close the walls... |
![]() |
| ... This should have been easy but mating the new oak to the old was a challenge; so george had to fight with this hard and eventually whittled a single wide board to take up all the slack. Here's what it looked like when he finished | ![]() |
|
day 5 -
friday, 8-aug-2003 1830pm- more progress-
|
![]() |
|
day 4 -
thursday, 7-aug-2003 1700pm- huge progress today-
|
|
day 3 -
wednesday, 6-aug-2003 1830pm- the new window is in! Thanks much to george's dad, kevin and christopher..! |
![]() |
|
day 3 -
wednesday, 6-aug-2003 1145am- George's dad has been up helping us- here he is in action. p.s. the new window is all framed here...! |
![]() |
![]() |
siding problems- we had to remove and replace the siding around the window and discovered lots of rot at the sill (both the cedar siding and the plywood were involved)... so we ripped out the affected plywood and replaced with PT plywood... this shouldn't be a problem again... | ![]() |
|
day two -
tuesday, 5-aug-2003 0700am- mj and the kids have left the house for the duration- right now all the old flooring has been removed... |
![]() |